This type of machine is specialized in vegetable and cormcutting. It is easily operating for woman. It is also the necessary facility for restaurants and second processing factories. Instantaneous ability is above 15 people. This machine will let you have satisfied feeling.

 

A.   Processing material

    Potatoes, carrots, melons, bamboos, onions, apples, vegetables and so on.

 

B. Processing dimension:

(standard)

               H                 10. 15. 20mm cubes or bars.

L              T            (special dimension)

                             3-20mm cubes or bars.

 

C. Capacity

15/mm cubes;    1000kg/hr

 

D.   Voltage

3 phase / 415V, 50Hz / 4P / 0.75KW

(each countries has different voltage connection)

E.   Machine dimension & weight

L 800×W 700×H 1260mm

 

F. Cutting work outline

    Connecting “ON” switch, add little water when machine is running and put suitable amount of material to the machine. (Material diameter under 8/cm). Leaf blade will turn over the material to the fixed thickness of the place of flate cutter. And crosscut cutter will cut the bars into cubes and flow down to the machine after round cutter cuts material into bars. Easily operate, and processing material is clean and delicacy.

 

 

 

 

 

 

 

 

 

 

 

G. Voltage connection

    Power: 3 phase / 415V / 4P / 0.75KW. Connect power cord (red, black, white) when use the machine. Then connect (green) line to insurance after that start to operating.

 B

 

 

 

 

 

               A

 

(1) The power line A connected to power supply. (Attention the    motor shift)

(Attention 4 power lines, green for the grounding line.)

(2) Water pipeline will be connected B, then the installation is completed.

 

 

 

H.   Installing location

    Consider whether the water drains unimpededly or not when install the machine.

 

I.   Watch out the machine running

    Make sure there are no foreign objects on the entrance of the machine and inside of the leaf blade after connecting voltage to avoid the cutter broken while the machine running. Make sure the direction of leaf blade is correct, rith circum gyratoin (clock-wise).

 

J. Method of adjusting thickness of flate cutting

The standard allocation method as follows: (if cut cube is formed by three Cutter)

(1) The first knife (cutting thickness): Plane broadswords Z.     (Adjustable by cutting thickness)

(2)   The second knife (cutting width): Circular knife Group Y.

  5mmP (space): 5mm

 10mmP (space): 10mm

 15mmP (space): 15mm

 20mmP (space): 20mm

 

(3)   The third knife (cut length): transverse plane knife Group.

5mm uses 15 knife group

10mm uses 8 knife group

15mm uses 6 knife group

20mm uses 4 knife group

 

K.   Method of adjusting aluminum fence

Aluminum fence feeds material to crosscut cutter when round cutter cuts the material. This is why the sharp place of aluminum fence has to get close to the cushion of gap of round cutter or the dimension of aluminum fence marks on the bottom right side.

 

L. Round cutter discharging

Round cutter dimension drawing

Round cutter dimension

 

 

Standard (mm)

P: 10

P: 15

P: 20

Special (mm)

P: 3-20

(1) Avert black screw of fixed eccentric axis.

(2) Pull down the fixed bolt of round cutter eccentric axis. Then round cutter can be discharged.

(3) Fix the u-shape spanner on the round cutter set, then loosen sexangular on the round cutter axis (two sides of 24m/m spanner), then it can be taken out.

 

 

 

M. Crosscut cutter discharge

Crosscut cubes round piece

5m/m uses 21 pieces

10m/m uses 8 pieces

15m/m uses 6 pieces

20m/m uses 4 pieces

(1) Fix u-shape spanner on the fixed crosscut cutter set when discharge crosscut cutter. Then loosen sexangular screw (24m/m spanner), then it can be taken out.

 

N. Daily cleansing

    Clean the machine after finish the jobs. Run the machine while operating, then wash it by flush water to clean the leavings.

O.   Standard by-products:

Spanner         10, 19, 24………….3

Screwdriver (-), (+)……….……………2

U-shape spanner                 1 PCS

Lubricant oil                    1

Tool box                       1 box

主站蜘蛛池模板: 欧美高清在线播放 | 久久人妻无码中文字幕第一 | 亚洲国产精品无码专区 | 亚洲精品国产永久无损音乐 | 国产人A片在线乱码视频 | 亚洲伊人成无码综合影院 | 日韩欧美视频在线播放 | 亚洲国产欧美在线一区二区三区 | 国产麻花豆剧传媒精品mv在线 | 五月丁香五月伦理 | 国产在线观看清码视频 | 国产成人精品台湾佬中文字幕 | 中国老妇xxxx性开放 | 天堂av无码一区二区三在线播放 | 国产精品久久久久7777按摩 | 亚洲综合无码一区二区三区 | 无码国产日韩精品一区二区密 | 欧美国产亚洲性色综合区 | 国产无码精品在线 | 日本午夜成年在线网站 | 中文弹幕日产无线码一区 | 丰满多毛的大隂户毛茸茸 | 国产一级无码av片在线观看 | av狼新人开放注册区 | 国产又粗又黄又爽的A片精华 | 无码中文字幕视频一区二区三区 | 国产精品无码一区二区三区在 | 成人H动漫AV无码无遮挡A片 | 亚洲国产精品久久电影欧美 | 国产av无码专区亚洲精品网站 | 免费国精产品自偷自偷免费看 | 精品国产露脸久久AV麻豆 | 黑人上司好猛我好爽中文字幕 | 亚洲第一成年免费网站 | 一区二区三区欧美区 | 亚洲最大av免费专区 | 国产成人精品免费视频网页大全 | 无码人妻少妇久久中文字幕蜜桃 | 亚洲大片在线免费看 | 亚洲精品欧美二区中文字幕 | 亚洲香蕉网久久综合影院3p |